one of the bathroom showers is leaking into the area behind the tile,
now I have asked for several contractor estimates and they all seem rather high
I was wondering whats involved that someone sees as so difficult or time consuming ETC.
any thoughts or previous experience would be helpful
now I watched the house being built and to me this certainly seems like something that could be done in a couple(3-4) days time
the showers about 40" wide x 60" deep, and tiled up to about 6 ft high
now I have asked for several contractor estimates and they all seem rather high
I was wondering whats involved that someone sees as so difficult or time consuming ETC.
any thoughts or previous experience would be helpful
now I watched the house being built and to me this certainly seems like something that could be done in a couple(3-4) days time
the showers about 40" wide x 60" deep, and tiled up to about 6 ft high